Saltbush Solar0491 570 156Book a roof check

Solar sized to your bill. Fitted by our own crew.

Perth homes from Mandurah to Joondalup. Fixed written quotes, CEC-accredited installers, most systems switched on in one day.

A two-storey home with a twelve-panel solar array on its tiled roof, under a clear sky

Bill estimator

Drag your last Synergy bill.

Set the slider to what you paid last quarter. The system size, battery, price and payback move with it.

$480

11 panels at 440 W. Your real layout comes from the satellite check.

4.84 kilowatt system, $11,350 to $15,050, payback 7.3 to 12.3 years.

4.84kW11 panels with a 10 kWh battery
Indicative price
$11,350 to $15,050
Saving a year
$1,200 to $1,550
Payback
7.3 to 12.3 years
Your daily use
About 13 kWh
Book a roof check

Estimate only. Assumes Synergy's Home Plan at about 31c per kWh plus $1.16 a day supply, 4.4 kWh per kW per day of Perth sun, 3c export credit, and prices after the federal small-scale rebate. Your written quote replaces it.

What you see before you sign.

An installer carrying a black solar panel up a shingle roof under a deep blue sky

Our crews, never subcontractors.

Every install is done by Saltbush employees with CEC accreditation. The person who checks your roof works on the install team.

Aerial view of a corrugated roof with two rows of solar panels, trees along one side

Read from above, then in person.

We lay the panels out on satellite imagery first, then confirm pitch, shading and the switchboard on a 40-minute visit.

One price, in writing.

Every part and rebate on its own line. Unless you change the job, that total is the invoice.

Sample quote
11 × 440 W panels, black frame$2,860
5 kW hybrid inverter, battery-ready$1,940
Rails, isolators and cabling$720
Installation and Western Power paperwork$1,150
Federal small-scale rebate (STCs)−$1,980
Total, GST included$4,690
Sample app screen
21.4kWh todayBattery 86%

Handed over on your phone.

Before we leave we set up the monitoring app with you, and show where generation, battery and export sit.

From booking to switch-on.

Seven stops, most of them on our side of the fence. The roof work itself takes one day.

  1. Today

    Book a roof check

    Pick a time online or call the office. We ask for your address and one recent Synergy bill.

  2. Within 2 business days

    Satellite layout

    We draft a panel layout on aerial imagery of your roof and size it against your bill.

  3. About 40 minutes

    On-site check

    A Saltbush installer checks the tiles or Colorbond, rafters, shading from trees and your switchboard.

  4. Same week

    Fixed written quote

    Every part and rebate on its own line. The price holds for 30 days and becomes the invoice.

  5. 1 to 3 weeks

    Western Power approval

    We lodge the grid connection application and book your install day once it comes back.

  6. Install day

    One crew, one day

    On site from 7am. Rails, panels, inverter and battery fitted and tested, usually by mid-afternoon.

  7. Before we leave

    Switch-on and handover

    We commission the system with you and set up the monitoring app. Synergy then updates your meter for export credits.

Rows of solar panels on a terracotta tile roof, a rainbow over clearing cloud behind

Batteries sized to your evenings.

We check which state and federal battery rebates apply to your home and show each one as its own line on the quote.

  • Battery-ready

    A hybrid inverter now and a battery whenever you want one. Lowest upfront cost.

    Suits: Bills under about $300 a quarter, or a house that sits empty until late.

  • 10 kWh

    Covers a typical Perth evening: cooking, lights, TV and the fridge through the night.

    Suits: Families home from 5pm.

  • 13.5 kWh and up

    Room to run the air-con after dark, with the pool pump moved to the middle of the day.

    Suits: Bills over about $700 a quarter.

Questions

The fine print, up front.

What warranty do I get?

Ten years on our workmanship, in writing. Manufacturer warranties on panels, inverter and battery sit on top, and if one fails we lodge the claim and do the swap.

Where do you install?

Perth metro, from Mandurah in the south to Joondalup in the north, and inland to Midland and Armadale. Further out, call and we will tell you straight whether we can do it.

How soon can you install?

Usually two to four weeks from a signed quote. Most of that wait is the Western Power connection approval, which we lodge for you.

Do I need three-phase power?

Up to about 6.6 kW of panels on a 5 kW inverter works on single-phase. Bigger systems usually need three-phase, and we check your meter box on the site visit.

What happens to my Synergy account?

You keep it. Power you use straight from the panels never reaches the meter, and what you send back earns a credit under Synergy's export scheme.

Can I add a battery later?

Yes. Every system we fit uses a battery-ready hybrid inverter unless you ask for something else, so adding one later is a half-day job.

Book a roof check.

Free, about 40 minutes, no obligation. We bring the satellite layout so you see your roof before you see a price.

Roof

Portfolio demo: this form validates but sends nothing.